Housing & Tourist Villages and their Utilities :

Interior works (roads, water, sewage, irrigation) And linking them on the main network of (1,2,3,4) quarters of the social housing area 1400 acres for the 1st. & 2 nd. Zone in New Menia City

Project value & Date:

  • The Value of contract is 164.324656 Million EGP
  • The Contract Date 8/24/2017
  • The End Date 6/30/2024

Project Description:

** Wastewater Networks:
* UPVC , pottery and reinforced concrete pipelines 160 mm dia.: 900 mm  with  length 45.4 km
** Potable Water Network:
* UPVC and DI pipelines 110:700 mm dia.,  with  length 57.9 km
 irrigation network:
* UPVC pipelines 75 mm dia.: 400 mm  with length. 27.9 km 
** Road Works 50 km length. ( main and byways) 