Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Diposal , in Bani Mazar City

Project value & Date:

  • The Value of contract is 130.547 Million EGP
  • The Contract Date 11/28/1996
  • The End Date 12/31/2023

Project Description:

Gravity Network :
  * V.C. pipelines of 7" : 24" dia. and 53.5 km total length.
  * R.C pipelines of 750 : 1100 mm dia. and 1.8 km total length.
  * UPVC pipelines 8'' :12'' dia., 26.8 km length .
Pressurized Pipelines :
* G.R.P. pipelines of 400 : 700 mm dia. & 10.2 km total length and 12 bar working pressure .
Crossings :
   * Concrete pipe 1800 mm dia. Under El-Ibrahimia canal and Railway to pass force Main of steel pipe 600 mm dia. And 96 m total length and 700 mm dia. Potable water.
   * Concrete pipe 2750 mm dia under darwish canal and El Raheb Drain to pass Force Main of steel pipe 700 mm dia. And 95 m total length.
* House connections : UPVC pipes , 6'':8'' dia. , 55.75 km length .
Pump stations:
* Subsidiary Pump station  of 51 L/sec discharge .
* Main Pump station of 161 L/sec discharge.
* Subsidiary Pump station of 103 L/sec discharge.
* Main Pump station of 175 L/sec discharge. 