Project Description:
Gravity Networks :
* V.C. pipelines of 175 : 900 mm dia. and 73.4 km total length.
* R.C. pipelines of 1100 & 1200 mm and 1 km total length.
Pressurised Pipeline :
* G.R.P pipelines of 500 : 900 mm dia. and 13.8 km total length and 12 bar working pressure .
Crossings :
* Hydrulic pipe Jacking of culvert under railway level by R.C. pipeline of 1500 mm dia.and 50.5 m total length to conduit D.I force main pipe line of 500 mm dia.
* Hydrulic pipe Jacking of culvert under Naga Hamady canal level by R.C. pipeline of 900 mm dia.and 190 m total length .
Open Cut Excavation type
* Open cut excavation for Six R.C under irregation canals and drainage canals crossing pipelines of 2000 mm dia. and 190 m total length to cnduit Six G.R.P. force main pipe lines of 500 : 900 mm dia. .
Flyover Crossing Pipelines Over Stream
* Ten flyover G.R.P. crossing pipelines over streams without out side conduit pipelines of 500 : 900 mm dia.
Pump Stations :
* Five pump stations of 75 : 940 L/sec discharge .
* Pump station No ( 1 ) of 100 L / sec .
* Pump station No ( 3 ) of 200 L / sec .
* Pump station No ( 4 ) of 220 L / sec .
* Pump station No ( 5 ) of 750 L / sec .
* Pump station No ( 6 ) of 800 L / sec .
Treatment plant :
* Sewage treatment plant (35000 m3 /day discharge) .
* 18 nos. Oxidation Bonds.
* Balance basins.
* Ground Reservoirs, Store & shop , chlorine & chemical building , pump & filters building , Administration building , Fence , guard house & gate and pipe network between lakes.