Société Egyptienne D’entreprises

Waste Water Disposal :

Treated water transmission line 10 th of Ramadan City to Bilbeis Drain(Dual Prestressed R.C of 1500 mm dia., & 11.5 km length)

Project value & Date:

  • The Value of contract is 120 Million EGP
  • The Contract Date 23/04/2017
  • The End Date 31/12/2020

Project Description:

* Dual pressurized R.C pipelines 1500 mm dia., 13.3 km length. +11valve champers 