Société Egyptienne D’entreprises

Waste Water Disposal :

Double Wastewater complex System from EL-America pump station to ELKhosos spiral pump station

Project value & Date:

  • The Value of contract is 354.553012 Million EGP
  • The Contract Date 4/12/2007
  • The End Date 4/30/2024

Project Description:

* Double R.C. Wastewater complex , 3.4 km length, measured 3m height * 4 m width. with internal lining of both ( blue bricks welded by   anti acid resistant epoxy material and anti vapour PVC sheets for the ceiling ) including connection rooms and maintenance openings 

iso certifications

iso certification

Suggested sites

Suggested sites

Company equipment

Suggested sites