Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater disposal of 3 villages ( Sakara-Meet Rahina - Dahshour )

Project value & Date:

  • The Value of contract is 151.1 Million EGP
  • The Contract Date 27/08/2009
  • The End Date 30/06/2021

Project Description:

* Gravity networks :
- UPVC pipelines from 150 : 300 mm dia.m 41.9km length.
- HDPE pipelines from 325:851 mm dia.,9.9 km length.
- RC pipelines from 900mm & 0.23 km length.
* Pressurized pipelines :
- HDPE pipelines from 500:800 mm dia., 4.35 km length.
- P.S.R.C pipelines of 800 mm dia. & 2.2 total length.
* 4 pump stations.
- dahshur village plant of dia 14 m height 20 m & discharge 300 L / sec
- main sakara plant of dia 14 m height 20 m & discharge 400 L/sec 
- secondary sakara plant of dia 5m height 12 m and discharge 150 L / sec 
- meet rahina plant of dia 5 m height 12 m & discharge 160 L/sec
*2 upper crossings above El moheet drain of sakara village  to pass steel  pipelines of dia 800 mm with length 100 m
*3 Crossings :
-trenchless excavation type under El moheet drain  in dahshur of dia 1800 m to pass DI  600 mm with length 80 m
- gravity crossing  meet rahina village of dia 2225 to pass DI with dia 700 with length 80 m 
- shapramant canal crossing- gravity line for sakara village with dia  1800 mm to pass DI pipelines of dia 600 mm and 35 m total length 