Project Description:
* Gravity Networks:
- upvc pipelines of 6" : 12" dia.& 23.593 km. Total length.
- VC pipelines of 7" : 32" mm dia.&11.874 km total length.
*home connections :UPVC pipelines of dia 160mm and total length 35.5 km
* Pressurized pipelines :
- GRP pipelines of 500 mm & 1.355 km length.
- HDPE pipelines of 250 ، 400 mm dia. & 5.902 km total length.
* Four pump stations :
- Main P.S for Emiay Village of discharge 92 L/S, of 12 m dia &11 height
- Booster P.S for Emiai Village of discharge 46 L/S, of 5m dia. &8 m height.
- P.S for ELAmaar Village of discharge 58L/S, of 11m dia. & 9 m height..
- P.S for El Fouqahaa Village of discharge 35 L/S ,of 4 m dia. & 8 m height..
* Wastewater Treatment Plant of 20000 m3/day discharge consists of :
- Ground Tank , Filters, drying basins , concentrated basins , chlorine building , Transformers room & 8 nos. Administration buildings.