Waste Water Disposal :

Wastewater disposal of (Abrash - Kafr Abrash) villages ,Mashtoul El Souk district

Project value & Date:

  • The Value of contract is 19.764 Million EGP
  • The Contract Date 3/23/2009
  • The End Date 2/7/2019

Project Description:

- Gravity network:
* VC pipelines of 15":28" dia  and  3.74 km length.
* UPVC pipelines of  160:315 mm dia. ,  46.4 km length.
- NOS 3 Pressurised pipelines.
- Main Pump station + Two subsidiary pump stations.
- Purification Plant discharge 12000 m3/day. 