Project Description:
Gravity Network :
* V.C. pipelines of 7" : 40" dia. and 44.3 km total length.
Pump Staitions :
* Two pump stations of 800 and 1200 L/sec discharge .
* Main pump station No. ( 4 ) its discharge is 1200 L/s, .
* subsidiary pump station No. ( 4 ) its discharge is 800 L/s, .
Pressurised Pipelines :
* G .R .P. pipeline of 700 dia. & 5.6 km total length and 10 bar working pressure .
* P .R .C . pipeline of 1000 mm dia. & 5.6 km total length and 13 bar working pressure .
* D.I . pipeline of 350 : 600 mm dia. & 17.2 km total length and 13 bar working pressure .
Crossings :
Trenchless Excavation Type
Under Rail Way staition No. 608 L by PRC pipeline of 700 mm dia. and 90 m length .
Under Rail Way staition No. 609 L by PRC pipeline of 2750 mm dia. and 90 m length .
Wastewater Treatment Plant :
* Sewage treatment plant of 12500 : 25000 m3/day capacity.