Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Disposal for Mashtoul El Souk

Project value & Date:

  • The Value of contract is 71.361051 Million EGP
  • The Contract Date 6/3/1997
  • The End Date 2/7/2019

Project Description:

Gravity Network :
 * V.C. pipelines of 7" :24" dia. and 53.828 km long.
 * D.I pipelines 430 : 1000 mm.dia. , 0.352 km. long.
 * House connections :
UPVC pipes 160 mm dia. , 35.063 km long .
Pressurized Pipeline :
 *  G.R.P. pipeline of 430 mm dia. and 2.28 km long. 
 *  G.R.P. pipeline of 500 mm dia. and 1.85 km long.
 *  G.R.P. pipeline of 700  mm dia. and 8.42 km length.
 *  G.R.P. pipeline of 400  mm dia. and 14.050 km long.
Crossing :
 * Trenchless excavation type for Hydrulic Pushing ( Mini Tunnel ) R.C.  pipe 2250 mm  & 43 m total length for the 300 mm dia. D.I  gravity pipelines under railway and Ganabia Mashtwol EL - Souk canal with RC outside casing body .
  * Open cut excavation type to pass 700 mm dia. & 36 m total length pressurized pipelines under Baher EL - Shebiny , without out side casing body .
  * * Open cut excavation type over Belbees canal for Presurized Pipeline 700 mm dia.
 Pump Station :
 *  One main pump station its discharge is 280L/S. 
  * Two pump stations its discharge is 130 and 130 L/S. 