Project Description:
Design and execution of all required works for suppling potable water to 7 villages containing the following items :
** Works of potable water resources (wells - mobile lifting units - treatment units - purification plants - developing and extension of the existing purification plants) .
** Boosters :
** 5 surface Plants (100 : 300 L/S) discharge
* intake
** Potable Water Networks :
* HDPE pipes 160 : 560 mm dia. and 16.6 km length.
* UPVC pipes 110 : 280 mm dia. and 128 km length.
** Potable Water Tanks:
* 11 Elevated water tanks (100 : 1000 m3) capacity.