Project Description:
Gravity Networks :
* V.C. pipelines of 175:1000 mm dia. and 53.5 km total length.
* R.C pipelines of 750 : 1200 mm , 0.8 km length.
Pressurized Pipelines :
* GRP pipelines of 430 : 700 mm , 3 km length.
* R.C. pipelines of 900 & 1000 mm & 18 km total length.
* CCP pipelines 800 mm dia., 5.7 km length.
*Crossings :
* R.C. culvert Under Railway cairo / aswan & Nagah Hamady canal of 2750mm dia . and 150 m length to pass D I pipeline of 700&900 mm . .
*R.C. culvert Under Nagah Hamady canal of 2250 mm dia. and 93.5 m length to pass D I pipeline of 400 mm dia., 93.5 m length.
*R.C. culvert Under Gergawaya canal of 3200 mm dia. and 100 m length to conduit D I pipeline of 400 mm dia., 55 m length.
* over fly culvert above ABU TIG canal to pass main force 1000 mm dia.
Pump Stations :
Four pump stations of 75 : 400 L/sec discharge .
* Pump station of 75 L / sec 8 m dai and 10 m length .
* Pump station of 150 L / sec 12 m dai and 10 m length .
* Pump station of 175 L / sec 14 m dai and 10 m length .
* Pump station of 400 L / sec 14 m dai and 12 m length.
Treatment Plant :
* Sewage treatment plant of 3500 m3/day discharge.
* 3 nos. Oxidation bonds .