Société Egyptienne D’entreprises

Waste Water Disposal :

Additional 7 villages in development project of Wastewater disposal system in Kafr EL Sheikh

Project value & Date:

  • The Value of contract is 155.910252 Million EGP
  • The Contract Date 11/6/2008
  • The End Date 6/30/2024

Project Description:

Gravity Network :
* UPVC pipline 6 : 12'' , 68 km length .
* VC pipline 15 : 18'' , 3.8 km length .
*home connections dia 6":8" with total length 26 km 
  Pressurized Pipline :
* Poly ethelein 400 mm dia.,  31 km length .
*Treatment plants.
*Pumpstations.
7 pump stations discharge from 74:340 L/sec   
*crossing 
*trenchless excavation type 
* R.C culvert of dia. 2250 with total length 34 m to conduit D.I of dia. 700 mm
* R.C culvert of dia 1500 mm  with length 12m to conduit  P.E of dia 450mm
*open cut excavation type
* 7 Nos HDPE pipline 300:700 mm dia. & 242 m total length 