Project Description:
Gravity Networks:
* VC piplines ( 12" to 24" dia) . of 25 km total length +UPVC pipelines ( 7": 10" dia) of 3 km length.
* PE sewage rising main( 200:300 mm dia ) of 2.7 km length.
* UPVC pipelines ( 150 :400 dia ) of 1.6km length
Pumping Stations : ( 2 main+3 Secondary )
* 3 Secondary Pump Stations at Sobk Al-Dahak village + 2 * Two Main Pump Stations at Kafr Al-Khadra og discharge from 200:30000m3/day
Wastwater Treatment plants:
* one wastwater Treatment plant in Sobk Al-Dahak & one Kafr El-Khadra of discharge 6000 m3/day each.
*crossings
- 2 pipe jacking crossings ( RC cultivate of 1500,1800 mm dia to pass a DI pipeline of 150 :600 mm dia with length 72 m .
-6 open cut excavations crossing DI of 250 :600 mm dia with 318.4 m length.