Société Egyptienne D’entreprises

United Arab Emirates :

Water Transmission Scheme from Madinat Zayed to Liwa and Qusahwira contract no. N-12192.1

Project value & Date:

  • The Value of contract is 350 Million AED
  • The Contract Date 11/26/2019
  • The End Date 6/30/2023

Project Description:

Lot A:
1.Modification of NMZPS constructed under ADWEA Contract G-5809.
2.New Muzairah pumping station with capacity of 24 MIGD, 3MIG storage:
 a.Pump house with electrical and control rooms
 b.Hypo-chlorination building
 c.Compressor building
 d.Fire water pump house
3.Hydraulic studies,Integration of all TOS and up to ADLDC

LOT B:
1.16 km DN 1200 CS pipeline from STF to NMPS
2.2 km DN 900 CS branch pipeline from DN 1200 CS pipeline to EMPS
3.2.1 km DN 1000 CS pipeline from NMPS to start of the DN 1000 CS of Lot 1
4.20 km DN 800 CS pipeline from Jabana to Abu Awana
5.83.1 km DN 400 DI pipeline from Abu Awana to Hameem and up to Qusahwira
6.2 nos.FOC along the pipelines and interface points with distribution company (ADDC/AADC)
7.Connection to DN 800 CS pipeline from Mirfa PS to EMZPS to provide for alternative supply to IPS-2 