Project Description:
Gravity Networks :
* V.C. and U.P.V.C. pipelines of 8" : 36" dia. and 226.3 km. total length.
* R.C. pipelines of 900 to 1500 mm dia. and 1.2 km total length.
Pressurized Pipelines :
* Ductile cast iron pipelines of 150 : 1200 mm dia. & 43.1 km total length and 9 bar working pressure .
Crossings :
8 Open Cut Excavation Type
* Open cut excavation type for R.C. culvert pipeline of 1500 mm dia. and 14 m total length to pass DI 300 mm dia.
* 7 Trenchless excavation type for Seven Culverts by R.C. Hydraulic Pushing ( Pipe Jacking ) pipelines of 1500 : 2750 mm dia. and 300.7 m total length as the following :
gth )
Pump Stations :
* 15 pump stations of 50 to 400 L/sec. Discharge.
Wastewater Treatment Plant :
* Sewage treatment plant ( phase 1) of 11000 m3/day discharge .
* Expansion to same plant ( phase 2) to increase the discharge from 11000 to 19000 m3/day.
* Expansion to same plant ( phase 3) to increase the discharge from 19000 to 37000 m3/day.