Project Description:
Design, Supply and Installation of the followings:
1-Water transmission pipelines of ductile cast iron as :
* 600 mm dia. with a total length 58 km .
* 350 mm dia. with a total length 3 km.
* 300mm dia. with a total length 13.5 km to supply Adam airport
* Tunnels with a total length 800 m.
2-HDPE ( high density polyethylene ) water
network distribution .
* 150 : 350 mm dia. with a total length 43 km.
3-Valves and fire hydrants on the way of the
pipelines.
4- Two ground reservoirs 5500 and 480 m3
capacity.
5- Two sations to fill up the tankers at Mitan and
AlBashayer villages ( every station contains point of fill the tanker and elevated tank 30 m3 capacity ).
6- Coloration building involved coloration
injection equipments.
7- Electrical installation work
8- The control works - Fiber-optic cables
( SCADA system )