Project Description:
Design, Supply and Installation of three sub-system as follows :
Dank system, Ibri system, Dut system. With the following contents.
- Development of 21 existing wells+drilling and development of 10 New wells & Development of 2 observation wells.
- Well field by 15.3 km D.I. pipelines of 150 : 900 mm.
- 6 pumping stations with 7678 - 41476 - 15891 - 10148 - 297 - 457 m Capacities
- 199.7 km of D.I. pipe lines 150 : 900 mm dia.
- 11 Ground Reservoirs with storage capacities 5000, 1625, 7600, 21645, 2925, 820, 1625, 410, 5000, 1625, 610 m3
- 7 Elevated storage with capacities 403, 403, 403, 616, 403, 403, 25 m3
- 1 break pressure tank with 403 m3 capacity .
- 5 water towers of 25 m3 capacity for each one .
- 17 Tanker filling points.
- Chlorination and floridation facilities at the three locations.
- Shoring for potable water supply of Ministry of Electricity and Water .
- Standby diesel generators at five pump stations
- A central works compound which will provide a central focus for administration, operation and maintenance of the works .
- A SCADA control system for entire works.