Housing & Tourist Villages and their Utilities :

Infrastructure for 15 th May City (first stage)

Project value & Date:

  • The Value of contract is 17.074 Million EGP
  • The Contract Date 12/31/1977
  • The End Date 12/8/1987

Project Description:

 Gravity Networks :
   * V.C. and U.P.V.C. pipelines of 7" : 32" dia. and 30 km total length.
Potable Water Supply :
  One temporary pump station.
Potable Water Networks :
   * Asbestos and steel pipelines  of 100 : 800 mm dia. and 34 km total length.
  One R.C. elevated water tank. 