Société Egyptienne D’entreprises

Waste Water Disposal :

Rehabilitation , Extension wastewater and industerial treatment plant at Bourg Elarab using Oxidation Ponds

Project value & Date:

  • The Value of contract is 436.24003 Million EGP
  • The Contract Date 3/16/2008
  • The End Date 6/30/2024

Project Description:

* Gravity Pipeline 1000 mm dia., 4.5 km length From wastewater  Treatment plant to pump station at Km 34.5 using R.C pipeline .
* Pressurized Pipeline Prestressed R.C 1000 mm dia. , 10.5 km length .
* Aerators
* Construct 6 oxidation ponds' basins (3 industrial wastewater disposal, 3 housing wastewater disposal)including 800mm cast Iron pipelines Connections and Valves Rooms
* Wastewater disposal 18 basins in pump station (9 housing basins , 9 industrial basins) .
* Rehabilitation of all the existing administration buildings including mechanical & electrical installations. 