Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater disposal of 3 villages ( Sandsees-Shobra Babel-Kafr Hegazi)-El Mahala El kobra

Project value & Date:

  • The Value of contract is 162.5775 Million EGP
  • The Contract Date 11/8/2008
  • The End Date 3/31/2024

Project Description:

* Gravity networks:
* V.C pipelines of 15" : 32" dia. & 5.2 km length.
* UPVC pipelines of 8" : 12" dia. & 86 km length.
* Pressurized pipelines:HDPE of dia 400:600 lof length 8.6 km 
* Pump Stations: 5 no.  PS discharge 43:130  L/S 

iso certifications

iso certification

Suggested sites

Suggested sites

Company equipment

Suggested sites