Project Description:
Gravity Networks :
* V.C. pipelines of 7" : 24" dia. and 40 km long.
* UPVC pipelines of 180:225 mm and 2.245 km long .
Presurized Pipeline :
* G.R.P. pipeline of 250 mm dia. and 2.322 km long.
* G.R.P. pipeline of 400 mm dia. and 6.14 km long.
* G.R.P. pipeline of 430 mm dia. and 6.257 km long. .
Crossing :
Trenchless Excavation Type
* Trenchless type for Hydrulic Pushing ( Mini Tunnel ) R.C pipe culvert of 1500 mm dia. & 42.5 m total length under Ismallia - Zakazek railway to pass pressurized D.I pipeline of 400 mm dia. .
* Trenchless type for Hydrulic Pushing ( Mini Tunnel ) R.C pipe culvert of 1500 mm dia. & 56.5 m total length under EL - Wady canal ( station No 2 ) to pass pressurized D.I pipeline of 400 mm dia. .
* Trenchless type for Hydrulic Pushing ( Mini Tunnel ) R.C pipe culvert of 1500 mm dia. & 89.5 m total length under EL - Wady canal ( station No 3 ) to pass pressurized D.I pipeline of 250 mm dia. .
* Open cut excavation under EL - Mashaa canal of 38 m length to pass pressurized pipeline of 400 mm dia. G.R.P.
Pump Stations :
* Two main pump stations.
* Two subsidary pump stations.