Turn Key contract for AL-Ameria potable water purification plant (to increase from 450000 m3/day to 650000 discharge) , consists of: * Intake. * 4 nos. clarifiers. * 10 nos. filters. * Ground Tank (35000 m3 capacity). * Treated water pump station. * Chlorine building. * Chemical building. * Sludge building and pumps for water * Sand Tank. * Crossing using hydraulic jacking from intake to raw water building (2 P.S.R.C pipelines of 1500 mm dia.) *Transformer building.