Infrastructure for industrial region A5 in the 10 th of Ramadan city
Project value & Date:
The Value of contract is 15.032641 Million EGP
The Contract Date 6/29/2005
The End Date 4/10/2008
Project Description:
* Sewerage networks :
UPVC pipelines from 200 : 600 mm dia. And 16.2 km length.
* Potable water networks :
UPVC pipelines from 110 : 500 mm dia. And 37.308 km length .
* Road Networks of 20.4 km length.