Potable Water and Wastewater networks for the Industrial Zone No. A'4 in 10 th. Of Ramadan City.
Project value & Date:
The Value of contract is 14.452841 Million EGP
The Contract Date 10/3/2004
The End Date 5/31/2006
Project Description:
Potable Water Networks :
* UPVC pipelines network from 110 : 630 mm dia., 24.5 km length.
Wastewater Networks :
* R.C. Gravity pipeline of 1300 mm dia. And 1.9 km length.
* UPVC Gravity pipelines network from 200 : 630 mm dia. And 11.1 km length.