Société Egyptienne D’entreprises

News & Events :

The company won the Ashur Water and Energy Network and Pumping Station Project in Mirbat, Salalah

5/27/2024

Details:

 The company won the Ashur Water and Energy Network and Pumping Station Project in Mirbat, Salalah, at a value of 27.5 million riyals. The scope of the project includes:
- Increasing the capacity of pumps at Ashur Station (4 pumps with a capacity of 385 liters/second) and making the necessary modifications to the existing station
- Establishing a tank with a capacity of 9100 m3 and the buildings attached to it (chlorine buildings, workshops, warehouses, generators, transformers, administration
and guard)
- Flower lines with a diameter of 300 mm to 1200 mm and a length of 44 km
- HDPE lines with a diameter of 110 mm to 900 mm and a length of 102 km 

iso certifications

iso certification

Suggested sites

Suggested sites

Company equipment

Suggested sites