Project Description:
Gravity Networks :
* V.C Pipelines of 7":36" dia , 58.974 km long.
* RC pipelines of 800:1000 mm dia. , 0.331 km length .
* DI pipelines of 400:1000 mm dia. , 0.87 km length .
* UPVC pipelines of 200:315 mm dia. , 16.258 km length . Home connections :
* UPVC pipelines of 160 mm dia. , 70 km length.
Presurised Pipeline:
* GRP Pipelines of 700 mm dia. , 4.807 km length.
* Poly Ethelin pipelines of 150 & 300 mm dia., 2.75 & 0.905 km length.
Crossings :
* Crossing under Elsaedia canal 50 m length by hydraulic tunnel system through RC sleeve 2250 mm dia. To pass GRP pipeline of 700 mm dia.
Pump Stations :
Pump stations including Civil & Electro-Michanical works for :
* one main its discharge is 20 L/S.
* Three Boostersits its discharge are 20 L/S.