Project Description:
* Rehabilitation of the old plant from 400000 to 600000 m3/day ( 200000 m3/day discharge)
* New Intake (660000 m3/day discharge) of 4 steel pipelines of 1600 mm dia. carried on a steel bridge of 50 m length.
* Double Pressurized P.S.R.C. pipelines of 1800 mm dia. & 750 m length.
* 2 crossings (P.S.R.C.pipelines casing of 3.2 m dia. & 120 m length to pass double steel pipelines of 1.8 m dia.+ a tunnel crossing of P.S.R.C. casing 3.2 m dia. to pass steel pipeline of 2.4m dia. and 150 m length.
* 4 pulsating clarifiers (measured 30m * 30m)
* 14 quick filters (measured 8m * 12.5m)
* Water ground storage tank ( 30000 m3 capacity).
* Chemical building.
* Chlorine building.
* Raw water pump station consists of :
1) 2 sewage well
2) operation building (pump engines + cotrol panels)
3) electricity transformes chamber
4) diesel elctric generator
5) 2 pipelines of dia. 700mm & 1200mm between plant units
6) electromechanical works