Project Description:
* 26 filters, washing tank and blower building " 3 parts"
* 4 clarifiers and quick mixing basins " 4 parts "
* Filtered water pump building
*Chemical building and liquid alum bases
* 4 ground resevoirs ( 25000 m3 each resevoirs)
* Steel pipelines for connecting between units ( 250 : 400 mm dia.,
* Outlet steel pipelines ( 1500 mm dia.,
* Main transformer room
* Sub transformer room
* 2 slurry ponds ( 30000 m3 capacity each pond)
* Filterition building
* Alum shade
* Ring Main Unit
* chlorine building
* Diesel and fuel building
* Land scaping ( cable ducts, potable
& sewage networks and site works)