Project Description:
Nekbas village:
*Gravity Network: UPVC pipeline,V.C pipeline 14 km length and 8":16" dia.
*P.E pressurised pipeline 4.5 km length & 560 mm dia.
*Pump station 9mm dia. includes:
* Administration,Transformers,low pressure,generators,security buildings
Meniet El Sebaa village:
*Gravity Network: UPVC pipeline,V.C pipeline 15 km length & 8" : 16" dia.
*P.E pressurised pipeline 1.6 km length & 450mm dia
*Pump station includes:
* Administration,Transformers,low pressure,generators,security buildings