Project Description:
Potable Water Treatment Plant :
* Construction of potable water Treatment plant of 600 l/sec. is extended to 1200 l/sec discharge
Potable Water Tanks :
* Reservoir 3000 m3 capacity.
* Two R.C. Elevated tanks of 5000 m3 capacities and 57 m height each .
* R.C. Elevated tank of 1700 m3 capacity and 57 m height .
* R.C. Elevated tanks of 5000 m3 capacity and 27 m height.
Main Potable Water Networks :
* Asbestos pipeline of 45 km in north of Kena dia from 150 :600 mm and 5 km in south of kena
Subsidiary Potable Water Networks :
* UPVC pipelines of 150 : 355 mm dia. & 12 km long. 12 bar working pressure
* Asbestos pipelines of 150 : 300 mm dia. & 106.23 km long. & 10 bar working pressure
* Steel pipelines of dia. 150 : 250 mm & 3.5 km long . & 10 bar working pressure
Crossings :
* Pipe Jacking under railway &road level culverts by R.C Hydraulic Pushing (Mini Tunnel ) pipelines as the following :
- Under Railway ( 1800 mm dia. &87 m length to conduit steel pipelines of 600 , DI of 700 mm dia. )
- Under Road Aswan cairo ( 1800 mm dia. & 25 m length to conduit DI of 700 mm dia. ) (to conduct recharged pipelines to join pressurized pipelines GRP )
Flyover Crossing Pipelines Over Stream
* 5 flyover steel crossing pipelines over streams without outside conduit pipelines of 800 mm dia. and different lengths carried on piles .
* 8 steel flyover crossing pipe lines over streams without outside conduit pipelines of 350 & 800 mm dia. and different lengths carried on piles
*crossing of naga garabo dia 500 mm steel pipelines with total length 104 m .