Project Description:
** Kafr Al Qassar:
* Pump station that pour out into slowdown chamber of Kofor Belshay pump station.
* Gravity network of UPVC pipelines (200,250,300) m dia with length 7086 m and 322 circular manhole.
* Pressurized pipeline of UPVC 200 mm inner dia.& 225 mm outer dia. with length 1443 m
** Abeeg :
* Pump station that pour out into Kofor Belshay pump station.
* Gravity network of UPVC pipelines (200:400) m dia with length 11000 m
* Pressurized pipeline of UPVC 300 mm inner dia.& 315 mm outer dia. with length 4970 m
** Qasta :
* Pump station that pour out into Kofor Belshay pump station.
* Gravity network of UPVC pipelines (200:500) m dia with length 11000 m
* Pressurized pipeline of UPVC 400 mm inner dia.& 450 mm outer dia. with length 5150 m