Project Description:
** Kafr Al Mahrouq & Al Naharya Village:
* Gravity Networks
V.C pipelines from 15" : 18", 1.281 km length.
UPVC pipelines from 6" : 12", 21.5 km length.
* UPVC house connections of dia 6 " length 14 km .
* Pressurized lines"
HD Polyethelyn pipelines of 250 : 300 mm dia. & 3.127 km length.
* Crossings : HDPE of dia 450 mm and length 70 m
- DI of dia 450 mm and length 12 m .
*2 Pump Stations discharge 41:50 L/S
** Al Degawya Village:
* Pump station that pour out into slowdown chamber of Abdallah Basha gravity network .
* Gravity network of UPVC pipelines (200,250,300) m dia with length 1900 m
* Pressurized pipeline of UPVC 160 mm dia. with length 950 m.