Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater disposal of ( AL Kafr AL Sharki - ALHamoul district & "Kafr Al Marazka ,Kelleen district"- Kafr Elsheikh Governorate

Project value & Date:

  • The Value of contract is 88.764762 Million EGP
  • The Contract Date 7/2/2009
  • The End Date 6/30/2024

Project Description:

** Gravity networks :
* UPVC pipelines from 6 : 12" dia. , 30 km length.
* VC pipelines from 15 : 18" dia. , 1.2 km length.
* home connections from UPVC  pipelines dia 6" with total length 3.9 km 
**Pressurized pipelines :
* Poly Ethellien pipelines  from 250 : 400 mm dia , 11 km length.
** Pump stations:. 3 no. discharge from 110 :180 L/S                                                           
crossings trenchless excavation
 * R.C  culvert of dia 1500 mm with total length 24 m to pass D.I  of dia 400 mm
 *R.C  culvert of dia 1250 mm with total length 40 m to pass D.I  dia 250 mm  
 open cut excavation type:
* 2 crossings from PE  of dia 400 mm and length 100 m total length 