Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Disposal For EL-Santa City + completion works

Project value & Date:

  • The Value of contract is 90.44372 Million EGP
  • The Contract Date 1/16/1996
  • The End Date 4/30/2024

Project Description:

Gravity Networks :
   * V.C. pipelines of 7" : 24" dia. and 44.7  km total length.
   * Ductile cast iron  pipelines of  200 : 500 mm dia. and 8 km total length and 9 bar working pressure 
Crossings :
 * Hydraulic pipe jacking for Four Culverts by R.C. pipelines as the following :
 * Under EL-Kourashia Canal ( 1500 mm dia. & 37.5 m length ) to pass D.I main force pipeline of 300 mm dia. .
 * Under Bahr Shibeen  (2250mm dia. & 65 m length ) to pass D.I main force pipeline of 400 mm dia.
 * Under Bahr Shibeen for double line  (2250 mm dia. & 67 m length )  to pass pair D.I main force pipeline of 200 & 300 mm dia. .
 * Under Shershaba Canal &the Railway ( 2000 mm dia. & 80 m length ) to pass D.I main force pipeline of 500 mm dia. .
 Open Cut Excavation Crossings 
* Under EL -Santa canal for  D.I gravity pipe line of 400 mm and 30 m length without outside casing.
Pump Stations :
 Five pump stations of 20 to 60 L/sec discharge.
 * Pump station of 20 L /sec discharge , 8 m dia. And 9 m height.
 * Pump station of 60 L /sec discharge, 10 m dia. And 12 m height.
 * Pump station of 30 L /sec discharge , 8 m dia. And 11 m height.
 * Pump station of 50 L /sec discharge , 9 m dia. And 12 m height.
 * Pump station of 30 L /sec discharge , 8 m dia. And 11 m height.
completion works:
 * Pump stations nos (6 &7) 