Roads, Bridges, Land Reclamation and Irrigation :

Infrastructure of Wadi El Nakra Reclamation Area and extension of Elkhrait and canal repair

Project value & Date:

  • The Value of contract is 314.344523 Million EGP
  • The Contract Date 3/24/1985
  • The End Date 1/1/2001

Project Description:

* Irrigation works:
Excavation and lining of 4 canals with a length of 82 km
Excavation and lining of 3 drains with a length of 42 km
- Construction of 6 bridges on the main canal.
- Construction of 1 bridge on the secondary canal.
- Structures on secondary canals.
- Construction of a bridge over Toshky and Abu Simbel canals.
- Construction a siphon on the main canal with a length of 60 m, 2 vents.
- Reservation bridge
- Main canal crossing (Below the railway of Egypt-Aswan Road)
- Toshky and Abu Simbel canal detour
* Land reclamation:
- Reclamation of 3,600 acres.
- Excavation quantities 18,000,000 m3 &
Backfill = 327261 m3
* 7 residential compounds.
* construct of  360 housing units.
*Al-Abaida village projects (sewerage networks + water supply networks + road works + schools + service buildings + residential buildings)
* Paving the main roads in Wadi An-Nukra 