Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Disposal of AL - Kawther City and Laying of Nida to El - Kawther City water Pipeline

Project value & Date:

  • The Value of contract is 80.854737 Million EGP
  • The Contract Date 5/18/1996
  • The End Date 3/31/2024

Project Description:

Gravity Networks :
   * V.C. pipelines of 225:1000 mm dia.  and 30 km total length.
   * R.C. pipelines of 800 : 900 mm dia. and 1.2 km total length.
Pressurised Pipelines :
   * G.R.P. pipelines of 600 : 800 mm dia. & 16.1 km total length and 9 bar working pressure .
Pump Stations :
 Two pump stations of 250 and 400 L/sec discharge .
   * Pump station of 400 L/sec discharge .
   * Pump station of 250 L/sec discharge .
Potable Water Networks :
   * Asbestos pipelines of 400 : 600 mm dia. & 9 km total length and 9 bar working pressure . 