Waste Water Disposal :

Extension of wastewater disposal in Shabrakheet

Project value & Date:

  • The Value of contract is 76.43478 Million EGP
  • The Contract Date 10/20/1996
  • The End Date 11/24/2010

Project Description:

Gravity Network :
  * V.C.  pipelines of 7" : 28" dia. and 33.245 km total length.
Pressurized Pipelines :
 *  D.I. pipelines of 400 mm dia. & 3.5 km length 15 bar working pressure .
 * G.R.P. pipelines of 400 mm dia. & 3.9 km length &15 bar working pressure .
Pump Stations :
  * 3 Pump stations.
Wastewater Treatment Plant :
  * Wastewater treatment plant of 4000  m3/day discharge . 
  *Third stage to increase the discharge to  20000 m3 / day. 