Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Disposal for Kafr EL Zayat and Dalgamon (77000 m3/day discharge)

Project value & Date:

  • The Value of contract is 228.354514 Million EGP
  • The Contract Date 4/7/1984
  • The End Date 3/25/2012

Project Description:

Gravity Networks :
  * V.C. pipelines of 8" : 24" dia. and 35.7 km  total length.
  * R.C.  pipelines of 700 : 1500 mm dia. and 4 km total length.
Pump Stations :
 * EL - Malal main pump station of 600 L/sec discharge .
 * EL - Delgamon main pump station of 400 L/sec discharge .
 * Mostafa Kamel subsidiary pump station of 400 L/sec discharge .
 * EL - Delgamon subsidiary pump station of 150 L/sec discharge .
Pressurized Pipelines :
  * Ductile cast iron  pipelines of 200 : 800 mm dia. and 12.53 km total length & working pressure 9 bar.
  * G.R.P. pipe lines 800 dia. and 1.2 km. Length & working pressure 9 bar. 
Crossings :
  Trenchless Excavation Type
    * Under EL - Sharicat  Railway in Kafr EL-Zayate (R.C sleeve of 3200 mm dia. & 52 m length) to conduit R.C gravity pipeline of 1200 mm dia.
    * Under EL - Sharicat  Railway & Ganag drain (R.C sleeve of 3200 mm dia. & 68 m length) to conduit twin R.C main force pipeline of 800 mm dia.
    * Two Under Menouf Railway (R.C sleeve of 2200 mm dia. & 70.4 m length)  to conduit twin steel main force pipeline of 500 mm dia. .
    * Under EL-Sharicat  Railway in Hasyba (R.C sleeve of 2000 mm dia. & 35 m length )  to conduit R.C gravity pipeline of 600 mm dia. .
    * Two for the Gravity Network in Delgamoun (R.C sleeve of 1200 mm dia. & 66 m length ) to conduit steel main force pipeline of 400 mm dia. .
 Open Cut Excavation Crossings 
 * Under Genage drain for double D.I force main pipeline of 800 mm and 20 m length 
 * Under EL-Neanaeia canal for double D.I force main pipeline of 800 mm and 35 m length .
 * Under EL-Neanaeia canal for D.I force main pipeline of 1000 mm and 35 m length without out side casing ( for treated water ) .
 * Under Tala drain for D.I force main pipeline of 500 mm and 114.8 m length without out side casing .
 * Under EL-Neanaeia canal for R.C force main pipeline of 500 mm and 49 m length without out side casing .
 * Open cut  excavation type for Culvert by R.C pipeline of 2500 mm dia. and 59.5 m total length to conduit twin steel main force pipeWastewater Treatment Plant :
  * Wastewater Treatment Plant of 77000  m3/day  discharge  .
  * Construction of screw pump station contained 3 screw pumps 1000 L/s discharge & 13 m high each. 