Société Egyptienne D’entreprises

Waste Water Disposal :

Wastewater Disposal for Mattaria + House connections (Dakahlya Governorate)

Project value & Date:

  • The Value of contract is 83.247826 Million EGP
  • The Contract Date 3/23/1997
  • The End Date 2/1/2010

Project Description:

Gravity Networks :
  * V.C. pipelines of 175 : 600 mm dia. and 124.344 km total length.
  * R.C. pipelines of 750 : 1200 mm dia. and 2.1 km total length.
  * D.I pipeline of 1000 mm & 1200 mm dia. And 45 m length.
Pressurised Pipeline :
  * G.R.P. pipeline of 600 mm dia. & 1.7 km. total length and 6 bar working pressure .
  * P.R.C. pipeline of 800 mm dia. & 2 km length and 6 bar working pressure .
Pump Stations :
  * Pump station No (1) of 525 L/sec discharge .
  * Pump station No (2) of 1161 L/sec discharge .
  * Pump station of No (3) 384 L/sec discharge .
Crossings :
  * Hydrulic pipe jacking for R.C pipelines of 3200 mm dia. and 66 m length to pass 600 mm and 800 mm D.I pipe line . 
  * Hydrulic pipe jacking of  R.C  pipelines  3200 mm dia. and 130 m  length to pass 600 mm and 800 mm D.I pipeline . 