Chairman Message
History & Milestone
Vision & Mission
Fields Of Interest
Board Of Directors
Organization Chart
Employee Benefits
Contact Us
Annual Reports
Company Performance
Quarterly Financial Positions
Share Holders
Refrance Banks
Waste Water Disposal
Potable Water
Roads & Bridges
Electrical Power
Industry & Public Buildings
Housing & Tourist Villages
Kingdom of Saudia Arabia
United Arab Emirates
Sultanate of Oman
Republic of Algeria
State of Kuwait
Libyan Arab Jamahiriya
Earthy works Equipment
Concrete Works Equipment
Lifting Equipment
Miscellaneous Equipment
Customers
Consultings
Suppliers
Subcontractors
Home Contact Us News Sitemap Legal help
Minister of Housing inspecting water plants in Sohag      ::      A delegation from the Sultanate of Oman visits the company.      ::      Minister of Housing and the Governor of sharkya inspecting water plant expansions in Hehia      ::      Minister of Public Business Sector visit the headquarters of Moukhtar Ibrahim co.      ::      Eng Mostafa Madboly - Minister of Housing , Utilities & Urban Communities visits the new administrative capital .      ::      Prime minister eng sherief Ismail visits Potable Water plant at 6th. of October City.      ::      
Sultanate of Oman : Construction of Transmission Pipelines, Pumping Stations, Transmission Reservoirs & Associated Buildings Contract No.136/2005 Project Description:
 Design, Supply and Install the followings :
* 130 km of steel water transmission pipelines of dia. From 650 mm : 900 mm with all associated reinforced concrete structures such as valve chambers, culverts, ducts & NDRC.
* 270 km of D.I water transmission pipelines of dia. From 150 mm : 700 mm with all associated reinforced concrete structures such as valve chambers, thrust blocks, culverts, ducts & NDRC.
* 18 Nos. of 800 to 5000 m3 capacity ground reservoirs complete with piping works and associated buildings.
* 8 Nos. water towers of 80 to 900 m3 capacity each and 30 m height complete with piping works.
* 10 Nos. pumping stations with different flow and head (Flow rate 2500 : 4000 m3/hr) and upgrading of 3 Nos existing pumping stations complete with wiring, switch gear , control system and associated buildings.
* 50 km Over-Head Cables.
* 310 km Fibre Optic Cable.
* Electro-mechanical and Control System. 


Project value & Date:
- The Value of contract is 49.404375 Million OMR
- The Contract Date 29/03/2006
- The End Date 5/31/2009