Chairman Message
History & Milestone
Vision & Mission
Fields Of Interest
Board Of Directors
Organization Chart
Employee Benefits
Contact Us
Annual Reports
Company Performance
Quarterly Financial Positions
Share Holders
Refrance Banks
Waste Water Disposal
Potable Water
Roads & Bridges
Electrical Power
Industry & Public Buildings
Housing & Tourist Villages
Kingdom of Saudia Arabia
United Arab Emirates
Sultanate of Oman
Republic of Algeria
State of Kuwait
Libyan Arab Jamahiriya
Earthy works Equipment
Concrete Works Equipment
Lifting Equipment
Miscellaneous Equipment
Customers
Consultings
Suppliers
Subcontractors
Home Contact Us News Sitemap Legal help
Minister of Housing inspecting water plants in Sohag      ::      A delegation from the Sultanate of Oman visits the company.      ::      Minister of Housing and the Governor of sharkya inspecting water plant expansions in Hehia      ::      Minister of Public Business Sector visit the headquarters of Moukhtar Ibrahim co.      ::      Eng Mostafa Madboly - Minister of Housing , Utilities & Urban Communities visits the new administrative capital .      ::      Prime minister eng sherief Ismail visits Potable Water plant at 6th. of October City.      ::      
Housing & Tourist Villages and their Utilities : Infrastructure of 6 th. October City Project Description:
 Wastewater System : 
Gravity Networks:
   * P.V.C  pipelines of  200 : 300 mm dia. and 9 km total length.
   * P.R.C pipelines of  700 : 1800 mm dia. and 14.2 km total length.
   * R.C   pipelines of   500 : 2000 mm dia. and 13.2 km total length.
   * P.V.C pipelines of 160 : 450 mm dia. and 97 km total length.
   * V.C   pipelines of  7" ; 18" dia. and 6.6 km total length.
Pressurized Pipelines :
   * Ductile Cast Iron pipeline of 400 mm dia. & 0.9 km length and 12 bar working pressure .
   * P.R.C. pipeline of 800 mm dia. , 32.2 km length and 12 bar working pressure .
   * R.C. pipelines of 1800 mm dia. , 0.04 km length and 12 bar working pressure .
Pump Stations :
  Three pump stations as the following :
 * Pump station of 900 L/sec discharge .
 * Pump station of 2400 L/sec discharge .
 * Pump station of 2700 L/sec discharge .
* Sewerage treatment plant of 100000 m3/day  discharge .
 * Screw Lifting pump station consists of 4 screw lifting pumps of 580 L/s discharge for each one ,6.39 m lifting height and spanish made.
Pump Stations :
   * Three units of 1500 L/sec discharge for each one.
   * Pump station of Gezera EL - Dahab intak , pump station of Km 13.5 and pump station of Km 20 .
Potable Water Supply Networks : 
   * Asbestos pipelines of 150 to 600 mm dia. & 292 km total length . 
   * R.C. pipelines of 700 : 1500 mm dia. & 50 km total length .
   * P.R.C. pipeline of 1200 mm dia. & 4 km length .  
   * Ductile Cast Iron pipelines of 700 : 800 mm dia. &16.4 km total length .
   * Galvanized steel  pipelines of 25 : 700 mm dia. & 36.2 km total length.
   * Steel  pipelines of 1500 mm dia. & 1 km length .
Crossings :
 * Trenchless Excavation type for under road level culvert by Hydrulic Pushing ( Mini Tunnel ) Steel pipeline of 1500 mm dia. and 25 m length.
 Elevated Water Tanks :
   * Elevated water tank for domestic area of 8000m3 capacity and 50 m high .
   *  Elevated water tank for idustrial area of 6000 capacity and 50 m high .
   *  Elevated water tank for touristic area of 6000 capacity and 40 m high .
 Roads : 
   * Main and subsidiary roads of 66 to 8 m wide and  248.8 km total length.
Electricity:
* Networks for districts.
Public Building :
 * Mosque - Toilets for conference room - Boundary wall . 


Project value & Date:
- The Value of contract is 394.872997 Million EGP
- The Contract Date 18/02/1980
- The End Date 6/30/2003